RENOVATION DIARY #16

UPDATE: We now have a working fire pit. I also started patching some holes left by the tv mounts downstairs and in the bedroom. I swear it looks like boobs with super pink nipples when it’s drying.

See? ➡️


The kiddos room is one step away from done. His bed came in yesterday and he likes it. Which is good because he insisted on having a futon so that’s what he’s stuck with unless he wants to replace it on his own. He’s grown now, so that is an option. Though it’s one that I doubt he’ll exercise lol.

The futon is a Serta which I didn’t even realize until it was delivered. On one side of the frame it has two regular plugs and two USB ports which is helpful since he tends to charge his phone while he’s hanging out on his bed. All in all it was a good purchase.

The last thing that we need to do is fix the wallpaper behind his bedroom door and his room is done.

Facebook Pinterest LinkedIn Reddit X
Sayre Ambrosio

Squarespace focused designer and business consultant.

https://www.stregaconsulting.com
Previous
Previous

RENOVATION DIARY #17 - PART 2

Next
Next

RENOVATION DIARY #15